On May 2, 2025, Uttar Pradesh made history as the Indian Air Force (IAF) conducted the first-ever day and night landing drills on a 3.5-km airstrip along the Ganga Expressway in Shahjahanpur. This milestone marks the expressway as India’s first with a 24/7 operational airstrip, designed to serve as an alternative runway during wartime or national emergencies. The event showcased India’s growing defence infrastructure and civil-military synergy.
Key Points:
- Inaugural day-night landing drills held on May 2, 2025.
- 3.5-km airstrip in Shahjahanpur, part of the 594-km Ganga Expressway.
- Enhances India’s defence readiness amid regional tensions.
Strategic Significance of the Airstrip
The Ganga Expressway airstrip is a critical addition to India’s military infrastructure, enabling round-the-clock operations for fighter jets and transport aircraft. Its development comes amid heightened India-Pakistan tensions following the Pahalgam terror attack on April 22, 2025. The airstrip’s ability to support night landings, using advanced lighting and CAT II Instrument Landing System (ILS), sets it apart from other expressway airstrips in India.
Key Points:
- First Indian expressway airstrip with night-landing capability.
- Supports rapid deployment and disaster response.
- Strategically located to connect western and eastern Uttar Pradesh.
Aircraft and Drills Performed
The IAF showcased a range of aircraft during the two-phase drill, including Rafale, Sukhoi-30 MKI, Mirage-2000, MiG-29, Jaguar, C-130J Super Hercules, AN-32, and MI-17 V5 helicopters. The exercises included low fly-pasts, touch-and-go maneuvers, and full landings, conducted during daylight and between 7 PM and 10 PM to test night operations.
Key Points:
- Daytime drills featured fly-pasts and simulated combat maneuvers.
- Night landings used night vision systems and ground-based lighting.
- Demonstrated IAF’s combat and disaster response capabilities.
Infrastructure and Security Features
The airstrip, built with military-grade materials, features reinforced pavement and precision approach lighting for safe operations in low-visibility conditions. Over 250 CCTV cameras ensure robust security, with additional measures like Swiss cottages and a German hangar for operational support. The facility is designed to handle heavy-duty aircraft, making it a versatile asset.
Key Points:
- Equipped with CAT II ILS and advanced lighting systems.
- 250+ CCTV cameras for surveillance and security.
- Reinforced pavement supports heavy aircraft like C-130J Super Hercules.
Ganga Expressway: A Dual-Use Marvel
Spanning 594 km from Meerut to Prayagraj, the Ganga Expressway is a ₹36,230 crore project set for completion by November 2025. It connects 12 districts and features six lanes (expandable to eight) with a 120 km/h design speed. Beyond its role as a transport corridor, the airstrip enhances its strategic value, positioning Uttar Pradesh as a leader in dual-use infrastructure.
Key Points:
- Connects Meerut, Hapur, Bulandshahr, Amroha, Sambhal, Badaun, Shahjahanpur, Hardoi, Unnao, Raebareli, Pratapgarh, and Prayagraj.
- Fourth UP expressway with an airstrip, following Agra-Lucknow, Purvanchal, and Bundelkhand.
- Plans for extension to Ghazipur and linkage with Bundelkhand Expressway.
Economic and Regional Impact
The Ganga Expressway and its airstrip are expected to drive economic growth by improving connectivity and fostering industrial development. The Uttar Pradesh government plans to establish an industrial hub near Shahjahanpur, creating thousands of jobs. The project also enhances regional connectivity, with links to Haridwar and a proposed Farrukhabad link expressway.
Key Points:
- Industrial hub to generate employment opportunities.
- Boosts connectivity across Uttar Pradesh and beyond.
- Supports movement of goods, people, and military assets.
Challenges and Preparations
The airstrip’s development faced challenges, including construction delays and the need for high-quality standards. Chief Minister Yogi Adityanath personally inspected the site, emphasizing timely completion and quality. Extensive preparations, including road closures, crowd management, and seating for 500+ schoolchildren, ensured a successful airshow attended by dignitaries and locals.
Key Points:
- CM Yogi Adityanath oversaw construction quality and progress.
- Katra-Jalalabad route closed during night drills for safety.
- Local enthusiasm reflected in large crowds and student participation.
Future Prospects
The success of the Ganga Expressway airstrip paves the way for similar dual-use infrastructure across India. Its 24/7 operational capability strengthens India’s defence preparedness and disaster response framework. The expressway’s completion by November 2025 will further enhance its role as a lifeline for Uttar Pradesh’s economic and strategic growth.
Key Points:
- Sets a benchmark for expressway airstrips nationwide.
- Enhances IAF’s operational flexibility for future drills.
- Supports Uttar Pradesh’s emergence as “Expressway Pradesh.”






